22.04.2026 - 22.05.2026
Date: from 22/04/2026 to 22/05/2026 (the time strictly necessary for the work)
Phase 1 :
Impossible to take the rue Brisée between the Rue Grande (N6) and the Rue de la Briqueterie
Phase 2 :
Impossible to take the rue Brisée between the Rue Grande (N6) and the Domaine de la Brisée
Tip: Follow the detour signs and plan to leave early.
Streets
- Territory Police S.H.A.P.E.